ASE slashes cable power consumption by 60% with Ciena

Upgrades have helped ASE be greener, enabling close to triple cable design capacity and massive reductions in power consumption. #pressrelease

March 8, 2023

1 Min Read

HANOVER, Md. – Asia Submarine-cable Express (ASE), a consortium of Asian telecommunications carriers managing the ASE cable system, is working with Ciena (NYSE: CIEN) to improve the design capacity and sustainability of its cable system.

Running a total of 8,148km, the ASE high-capacity cable system connects Japan to Hong Kong, Malaysia, the Philippines, and Singapore. Ciena's GeoMesh Extreme, leveraging Waveserver 5 powered by WaveLogic 5 Extreme and an optical bypass, will deliver more capacity through ASE's existing cable, enabling improvement in its design capacity of 193%. Optimized for 100GbE and 400GbE applications with unmatched scaling capabilities, Waveserver 5 also minimizes ASE's rack space and reduces power consumption by 60% for a greener solution.

The ASE cable also utilizes Ciena's 6500 Packet-Optical Platforms in a Submarine Line Terminal Equipment (SLTE) configuration and Manage, Control and Plan (MCP) domain controller. Ciena Services is providing consulting, systems integration, maintenance and network transformation services to the cable, a collaboration between the region's telecommunication carriers—NTT Ltd Japan Corporation (NTT LJ), PLDT, StarHub and Telekom Malaysia.

Read the full press release here.

Ciena

Read more about:

Asia
Subscribe and receive the latest news from the industry.
Join 62,000+ members. Yes it's completely free.

You May Also Like