Caucasus Online chooses Tyco Telecommunications to construct undersea fiber optic cable system connecting Georgia and Bulgaria

September 11, 2007

2 Min Read

TBILISI, Ga. and MORRISTOWN, N.J. -- Independent Georgian telecommunications provider Caucasus Online and Tyco Telecommunications, a business unit of Tyco Electronics and an industry pioneer in undersea communications technology, announced today the signing of a contract to construct an undersea fiber optic system that will provide high bandwidth connectivity between Poti, Republic of Georgia and Varna, Bulgaria. The system will serve Georgian markets by providing direct access to Western Europe via a state-of-the-art undersea fiber optic link.

“The Republic of Georgia has a rapidly expanding demand for bandwidth and access to the internet,” explains Mamia Sanadiradze, CEO of Caucasus Online. “The undersea solution we are deploying with Tyco Telecommunications will serve markets in Georgia and the Caspian region with a system that meets our stringent criteria for capacity, scalability and robustness using advanced, proven technologies.”

The system will be comprised of a 2 fiber pair point to point link connecting the main Georgian port of Poti with the Bulgarian coastal city of Varna. The system will have an ultimate capacity to transmit 64 10 Gigabit wavelengths on each fiber pair for a total bandwidth of nearly 1.3 Terabits. Onward connectivity from Poti to Tbilisi, Georgia and the rest of the Caucasus region will be provided on the Caucasus Online terrestrial network. Caucasus Online is developing a terrestrial link from Varna to Sophia, Bulgaria where it will connect to the rest of Europe through service agreements with international carriers.

“The Black Sea presents unique technical and geopolitical challenges. Nevertheless, regional systems such as the Caucasus System require the same scalability and reliability as trans-oceanic systems, in an economic package,” says Rob Munier, managing director for global solutions at Tyco Telecommunications. “The system we are building with Caucasus will deploy the latest generation of equipment (G3) which features small form factor and highly efficient transmission equipment; reducing both capital and operating expenditures without compromising performance. The unique oceanographic environment will also require special enhancements of the undersea components in order to ensure the 25 year engineering design life.”

Tyco Telecommunications

Subscribe and receive the latest news from the industry.
Join 62,000+ members. Yes it's completely free.

You May Also Like